Wednesday, May 27, 2009

Bombardier BTS SkyTrain Extension


With all the fun we’ve been having here in Thailand, you may be wondering what we’ve really been up to here in Bangkok?! The answer to this is…working on the “BTS Skytrain Extension”.

The BTS Skytrain is Bangkok’s above ground train. Bangkok also has an underground metro of which we know very little about :o). The project we have been working on is creating the signalling system for the extension of the Silom line including 2 old stations (S5 & S6) and 2 new stations S7 and S8.

Below is a first hand view of this large-scale railway project! If you like trains, you’re going to enjoy these pics! :O)


*******


The Project won the President’s Excellence Award! Marcus works as the Test lead for the complete system and I work in the System Integration & Test group (doing automated tests for the line).

Congratulations to the BTS Green Line (Bangkok SkyTrain) Resignalling & Extension Project Team on winning the “RCS President’s Team Excellence Award”

For the successful delivery of our CityFlo 450 communication based train control (CBTC) solution over the border stations of the existing Silom Line and the new Extension from S6 to S8. 
Anders Lindberg
President, Rail Control Solutions
Bangkok, 15th May 2009



May 15th 2009 marked the official opening of the extended line!

The Prime Minister along with Bombardier’s top management & lead engineering was in attendance to ride the train at 5:00am in the morning!! There’s Marcus!!! :o) The ceremony was widely captured by the media and published in the day’s newspapers and on the news.



The Extension - Replacement of S5 & S6 and 2 new Stations Krong Thon Buri & Wongwian Yai!



Visit to the local Control Room to see the system we work on "Live".  The train operator station displays how the trains are travelling on the line.



The first Station - S5 Surasak



Below are EuroBalises.
EuroBalises on the track indicate the train’s location. When the train crosses a Balise, a telegram with information about the track ahead, is sent to the train ATC on-board system.





All parts of the signalling system, including radio communication, the train operator station, interlocking (the part that makes sure the trains don't collide), and the onboard system are developed by Bombardier.  Currently a driver is needed to operate the train, but in the next step it will be able to drive all by itself (driver-less).





"NOT IN SERVICE"



"NOT IN SERVICE" in THAI :O) cool eh?



The last station of the Extension - S8 Wongwian Yai





While waiting for the driver-less system to make the stops 
at the right position you can use tape instead.  :o)





Inside an empty train!! Very unusual because it is normally jam-packed with people!!












The "Control Room" where the train operators are monitoring the traffic and directing the trains when needed.




Most of the line has double tracks.   However in one section of the line, there is a single track. The platform signs indicate where the train is headed based on where it stops.  
Good to check before you get in! I've made this mistake before! :o) and ended up downtown! 




Switchover (from new extension to existing line) at almost the stroke of midnight!




Purchase your train tickets here!




Map of the line




All the Stations!




About to open for business!




The tracks run above the city! Appropriately named "SkyTrain"!











NEW S8 Station not yet open!!









The doors on the right lead to different rooms. One of them was the local control room shown earlier! (In case you ever wonder what's behind those doors ;o))

This is also a "Before Ceremony" picture!




Ready and waiting for the Prime Minister! (& Marcus) hahaha





A History Lesson on the building and design of the Skytrain tracks, stations, safety, signalling & finally kick-off!



1 February 1979 - The two parallel spans of the Taksin Bridge were fabricated.  The opposing traffic flows were separated by a 15 metre space, ready for the construction of future rail-based transportation networks.





25 January 2002 & 24 March 2004- The Elevated Road along Phasi Charoen Canal project underwent structural adjustment adding a bride crossing the Chao Phraya River and being extended to Phet Kasem Road. This completed the BTS Silom Extension Project.





11 November 2005 - Construction of the BTS Silom Extension Project (2.2 kilometres) was commenced, including work on railway track connecting to Sapha Taksin Station, two stations and associated infrastructure.
29 February 2008 - The signal control system was installed.





1 March 2009 - Test Runs without passengers were commenced.

13 April 2009 - The signal control, communication, electro-mechanical, safety and other relevant systems were checked.





25 April 2008 - The communication, electricity supply, data storage and control and building service systems were installed at the stations.

23 April 2009 - The completion of the project was reported to the Governor of Bangkok.



May 15th 2009

The BTS Silom Extension (2.2 Kilometres) is opened for service with fare exemption




13 August 2009 - Full services will be launched with fare collection.




The Communication Based Train Control (CBTC) system

has been adapted due to its long-term precision and efficient operation. The current BTS SkyTrain system is to be substituted with this state-of-the-art radio communication technology to ensure both efficient service in the future and low-cost maintenance.



****

Hope you enjoyed the Train Pics!!

*** In other news Marcus & I moved apartments right next door to where we were originally living.  It's a cozier apartment :o) We will stay here until the end of our contract. 

I have also started learning Swedish again..let's hope it goes better the second time around! haha We both know enough Thai now to get around..a little bit ;o)

The last set of news is that we're coming home and visiting Canada & Sweden in June & July!! We are SUPER excited to see everyone!

There will be one last final post next week to recap our last 7 months and then we'll say goodbye to the blog!! Thanks for following!
Claudia & Marcus

3 comments:

Jen G said...

wow - so cool - congratulations on such a successful project! my son loves trains and he will enjoy these pictures :)

Patrik said...

Wow, Marcus is FAMOUS!!! :-)
Great job!
/P

Anonymous said...

Interesting post!!! I like their trains... and the station is all clean (for now!) hehehe!!

Looking forward to the next post... and hopefully we'll see you in June!

Catherine F.